UPS Installation & commissioning

Installation & commissioning

Activolt provides UPS installation and commissioning services to ensure that your system is set up correctly and working efficiently. Our experienced team of professionals will ensure that your system is installed correctly, configured correctly, and tested thoroughly

UPS Installation

Activolt offers installation services Nationwide. Our engineers have lots of experience in installing and setting up systems in many locations, both in the country and abroad. We can handle any size or complexity of project.

All labours (including UPS, generator and related electrical switchgear setting up) are executed according to quotation by one of our authorised collaborators and erections are assessed to the most exceptional norms prior to authentication and relinquishment.

COMMISSIONING

Activolt offers full commissioning services that guarantee a smooth installation, testing, onsite configuration, and start up process. We pride ourselves on the quality of our work, our cost-effectiveness, and our commitment to safety, making us the perfect partner for your UPS needs, now and in the future.

Key aspects to note are:

DECOMMISSIONING

When UPS or generator system is no longer in use, our evacuation and reuse service allows us to take it away and dispose of it in an environmentally friendly way. Only certified engineers and technicians are hired to commission, instruct, and replace it as part of the same site visit. This can be done either during normal business hours or at flexible times with prior arrangement to accommodate the project timeline.